The structural footings, foundations and site retaining walls are underway at our senior living facility in Monterey. The crews have started constructing the site retaining walls in several locations on site allowing concrete foundation work to begin. Check out the video of one of the concrete pours for a retaining wall form work.
The Arch Culvert Bridge has been installed over the ravine that runs through the project site. The installation process took place over a two day period using a 100 ton crane to lift it into place. With the bridge installed, the detailing work will begin with backfilling and rough road grating over the bridge. Now that the site work is substantially complete crews can focus on building.