Heading into the new year, the Baxter on Broadway project is moving to start on interior finishes including paint, doors and cabinets on the top floors while the lower levels of the building are substantially complete with drywall!
The exterior of the building has been changing colors with the completion of the building paper and continuation of the rigid insulation. Our crew is now completing preparation for stucco on Broadway and looking ahead to installing fiber cement siding next.
On Desmond Street, the four townhouses are full steam ahead with structural framing following the completion of the steel moment frames. The framing is expected to see the third level this month and accept delivery of roof trusses. We are very excited to see these homes take shape!